*Demurrage & Detention Free Time and Charges for all Trades except for cargo originating from/destined to US ports and points via US ports. Please refer to http://rates.etransport.com/oocl/for details of United States related Services
Demurrage: What is it?
Demurrage charges are applied for storage of laden containers whilst in OOCL’s care in a port, rail terminal, feeder terminal, inland depot or container yard. Demurrage is applied after a designated free time.
Detention: What is it?
Detention charges are applied for the storage or holding of containers whilst in our customers’ care outside a port, rail terminal, feeder terminal, inland depot or container yard. Detention is applied after a designated free time.
There are 2 types of Detention:-
Merchant Haulage: when customers do their own trucking and have to return the container back to OOCL’s care within the free period.
Carrier Haulage (Drop & Collect): container is left at the customer’s own premises whilst they load or devan it. OOCL's vehicle returns a different day to pull it out.
Click Here for USA Detention & Demurrage Free Time and Charges
TAT Westbound
Detention
Dry - 3 working days, thereafter USD75 per container/day
Reefer - 2 working days, thereafter USD175 per container/day
Demurrage
Dry - 3 working days, thereafter USD100 per container/day
Tanks - 2 working days, thereafter USD225 per container/day
TAT Eastbound
Detention
Dry (GP/HQ) - 5 working days, thereafter USD85 per container/day
Dry (FL/OT) - 5 working days, thereafter USD120 per container/day
Reefer - 3 working days, thereafter USDUSD120 per container/day
Demurrage
Dry - 5 working days, thereafter USD65 per container/day
Tanks - 5 working days, thereafter USD100 per container/day
Reefer - 5 working days, thereafter USD150 per container/day
TRANSPACIFIC WB:
PORT DEMURRAGE AT ORIGIN CANADA
FREE TIME:
Free time for cargo received at carrier's loading port break bulk terminal, CFS, or CY shall be five (5) working days (Saturday/Sunday/holidays excluded).
DEMURRAGE CHARGES WHEN FREETIME ENDS ARE AS FOLLOWS:
1. Dry cargo in GP container & non-operating reefer container - $100 per container per calendar day
2. Dry cargo in specialized equipments- open top; flat beds; flat racks; tank - $150 per container per calendar day
3. Cargo in operating reefer container - $225 per container per calendar day
DETENTION AT ORIGIN CANADA
FREE TIME
- For 20, 40 and 45 foot dry containers. Day of initial interchange plus five (5) working days.
- For 20 or 40 foot open top containers. Day of initial interchange plus five (5)) working days.
- For refrigerated or tank containers. Day of initial interchange plus three (3) working days.
- For other equipment, which may be provided like trailers, low boy trailers and equipment leased for special projects. Day of initial interchange plus three (3) working days
DETENTION CHARGES WHEN FREETIME ENDS ARE AS FOLLOWS:
- For 20 foot dry containers US $ 25.00 per day
- For 40 and 45 foot dry containers US $ 50.00 per day
- For refrigerated and other containers US $ 100.00 per day
TRANSPACIFIC EB:
PORT DEMURRAGE AT DESTINATION CANADA
FREE TIME:
DRY CONTAINERS (FCL)
Dry containers held with cargo, at carrier's Discharge Port CY, undelivered for (3) days, Saturdays, Sundays and local legal holidays excluded, after 8.00am on the first business day after completion of discharge of the vessel or delivery at the carrier's CY and shall expire at midnight on the (3rd) day, Saturdays, Sundays and local legal holidays excluded.
REFRIGERATED/TEMPERATURE CONTROLLED (FCL)
Refrigerated/Temperature Controlled containers must be accepted by the consignee at Carrier's CY within 48 hours Saturdays, Sundays and local legal holidays excluded, after 8.00am on the first business day following the completion of discharge of the vessel or delivery at the carrier's CY.
DEMURRAGE CHARGES WHEN FREETIME ENDS ARE AS FOLLOWS:
Dry:
DAYS PC20' All others
1 - 5 US $ 15.50 US $ 31.00
Thereafter US $ 31.00 US $ 62.00
Reefer:
DAY PC20' PC40'
Per Day US $ 60.00 US $ 80.00
DETENTION AT DESTINATION CANADA
FREE TIME
1. For 20, 40 and 45 foot dry containers. Day of initial interchange plus three (3) working days
2. For 20 or 40 foot open top containers. Day of initial interchange plus three (3) working days
3. For refrigerated or tank containers. Day of initial interchange plus one (1) working day
4. For other equipment, which may be provided like trailers, low boy trailers and equipment leased for special projects. Day of initial interchange plus one (1) working day
DETENTION CHARGES WHEN FREETIME ENDS ARE AS FOLLOWS:
1. For 20 foot dry containers US $ 25.00 per day
2. For 40 and 45 foot dry containers US $ 50.00 per day
3. For refrigerated and other containers US $ 100.00 per day