Terminal Limitations:
Berths:
|
Berth
Number
|
Draft
Alongside
|
Maximum
Permissible Vessel Draft
|
Draft
Variance Alongside
|
Total
Length In Meters
|
|
13
|
16.0 Meters
|
14.5 Meters
|
.85 Meter
|
400 Meters
|
|
14
|
16.0 Meters
|
14.5 Meters
|
.85 Meter
|
381 Meters
|
|
16
|
10.7 Meters
|
9.2 Meters
|
.8 Meter
|
143 Meters
|
|
17
|
12.6 Meters
|
10.5 Meters
|
.85 Meter
|
210 Meters
|
|
18
|
12.6 Meters
|
10.5 Meters
|
.85 Meter
|
210 Meters
|
Berth 13/14
Elevation
of Quay Deck from sea Level at Max Tide: 3.0 Meters
Length
Overall: 781
Meters
Number
of Bollards: 33
Bollards
Safe
Bollard Pull: 100
Tons (150 Tons Breakaway)
Gap
from bollard To Bollard: 21 Meters
Number
of Fenders: 52
Fenders Spacing 16 Meters
Length
of Gantry Crane Rail Run: 659
Meters
Maximum
Permissible LOA of Vessel: 350 Meters
Berth 17/18
Elevation
of Quay Deck from sea Level at Max Tide: 3.0 Meters
Length
Overall: 420 Meters
Number
of Bollards: 21
Bollards
Safe
Bollard Pull: 100
Tons (150 Tons Breakaway)
Gap
from bollard To Bollard: 20.6 Meters
Number
of Fenders: 27
Fenders Spacing 10.3 Meters
Length
of Gantry Crane Rail Run: 380 Meters
Maximum
Permissible LOA of Vessel: 250
Meters
Equipment
|
Gantry
Cranes STS
|
|
Gantry Crane STS Number
|
STS 01-02 Berth 17/18 (NCT) Quantity
2 cranes
|
STS 03 Berth 17/18
Quantity 1 Crane
|
STS 04 Berth 17/18
Quantity 1 Crane
|
STS 05-06-07-08 Berth 13/14
Quantity 4 Cranes
|
|
Back Reach
|
17.5 Meters
|
17.5 Meters
|
17.5 Meters
|
17.5 Meters
|
|
Clearance Between Legs
|
17 Meters
|
17 Meters
|
17 Meters
|
17.5 Meters
|
|
Out Reach From Quay Wall
|
38.5 Meters (13 Containers
Across)
|
38.5 Meters (14 Containers
Across)
|
46 Meters (15 Containers
Across)
|
50 Meters (18 Containers
Across)
|
|
Upper Lift Above Quay Deck
|
27 Meters ( 1 over 3 above
deck)
|
27 Meters ( 1 over 3 above
Deck )
|
30 Meters ( 1 over 4 above deck
)
|
34 Meters ( 1 over 5 above
deck )
|
|
Lower Limit Below Quay Deck
|
Less 15 Meters
|
Less 15 Meters
|
Less 15 Meters
|
Less 15 Meters
|
|
Lifting Capacity Under Spreader
|
40 Tons Single lift
|
45 Tons Single Lift
|
45 Tons Single Lift
|
50 Tons single lift or 65
Tons Twin Lift
|
|
Lifting Capacity Under Hook
|
40 Tons
|
50 Tons
|
50 Tons
|
75 Tons
|
DG Limitations:
Hazardous Containers IMO Class 1 Explosives & IMO Class 7
(Radio active) - DIRECT DELIVERY ONLY.
Vsl will not be berthed if arrangements for direct delivery not made
Prior
approvals to be taken from various government authorities before acceptance of booking.
Prior approval to be taken from port
authorities before acceptance of any DG cargo.
DG cargo manifest to be submitted prior
arrival of vsl.
Approvals from feeder operators / vsl
operators to be obtained prior booking acceptance.
Cargo Restrictions:
Effective 7th December 2017,
Sudan government announced to temporarily ban under mentioned commodities for
import to Sudan.
1- Meat Products
2- Live Animals
3- Milk productions except dry milk powder & infant milk
4- All kind of juices
5- Halva
6- Fish
7- Fruits
8- Vegetables
9- Cocoa preparations
10- Macaroni & Vermicelli
11- Vegetables Oil, except Edible Oil which is not refined.
12- Artificial flowers
13- Plaits Products
14- Toys, Games and Sports requisites.
15- Pet Birds
16- Flowers & Branches
17- Sun Umbrella & Sun Shade
18- Detergents
19- Sponge mattresses