100年12月31日(週六)至 101年1月1日(週日)適逢元旦新年假期,台灣東方海外高雄貨櫃中心 (第65/66碼頭) 之碼頭前線作業及一般進出口空、重櫃之領交作業一律正常,OOCL高雄貨櫃中心營業時段,歡迎多加利用。
December 30, 2011
Please be advised that M.V. THORSCAPE 010S will delay 23 hours to Keelung due to Heavy berth congestion at Osaka ports. The ETA Keelung port will be revised to Jan 01st, 2012.
The vessel schedule is adjusted as follows:
ETD Keelung: Jan 2th, 2012
ETA Hong Kong: Jan 3th, 2012
ETA Singapore: Jan 8th, 2012
ETA Jakarta: Jan 10th, 2012
December 30, 2011
感謝您多年來對本公司的支持和照顧,在此敬表謝忱,並祝新年快樂 !
為反映作業成本,對於非以e-SI方式提供資料之出口提單,本公司將調整其出口文件費,調漲幅度及生效日期如下:
December 30, 2011
Please be advised that M.V. BERLIN EXPRESS 57W49 will delay 39 hours to Kaohsiung due to terminal and weather related issues at previous ports. The ETA Kaohsiung port will be revised to Dec 28th, 2011.
The vessel schedule is adjusted as follows:
ETD Kaohsiung: Dec 28th, 2011
ETA Hong Kong: Dec 29th, 2011
ETA Singapore: Jan 3th, 2012
ETA Laem Chabang: Jan 6th, 2012
December 27, 2011
Please be advised that M.V. NYK APOLLO 60W48 will delay 34 hours to Kaohsiung due to port closure at previous ports. The ETA Kaohsiung port will be revised to Dec 25th, 2011.
The vessel schedule is adjusted as follows:
ETD Kaohsiung: Dec 25th, 2011
ETA Laem Chabang: Jan 01, 2012
December 21, 2011
Please be advised that M.V. KIEL EXPRESS 18W44/18E51 will delay 60 hours to Kaohsiung due to terminal and weather related issues at previous ports. The ETA Kaohsiung port will be revised to Dec 22th, 2011.
The vessel schedule is adjusted as follows:
ETD Kaohsiung: Dec 23th, 2011
ETA Kobe: Dec 28th, 2011
ETA Nagoya: Dec 29th, 2011
ETA Tokyo: Dec 30th, 2011
December 20, 2011
Please be advised that M.V. TENG YUN HE 062S/N will change port rotation at Taiwan from Kaohsiung-Taichung-Keelung to Keelung-Taichung-Kaohsiung. The vessel schedule is adjusted as follows:
ETA Keelung: Dec 20th, 2011
ETA Taichung: Dec 21th, 2011
ETA Kaohsiung: Dec 21th, 2011
ETA Ningbo: Dec 23th, 2011
ETA Qingdao: Dec 24th, 2011
ETA Xingang: Dec 26th, 2011
ETA Dalian: Dec 27th, 2011
ETA Lianyungang: Dec 28th, 2011
December 19, 2011
Please be advised that M.V. SHANGHAI EXPRESS 62E49 will delay 39 hours to Kaohsiung due to bad weather at previous ports. The ETA Kaohsiung port will be revised to Dec 17th, 2011.
The vessel schedule is adjusted as follows:
ETD Kaohsiung: Dec 17th, 2011
ETA Vancouver: Dec 28th, 2011
ETA Seattel : Dec 31th, 2011
December 15, 2011
Please be advised that M.V. TENG YUN HE 062S/N will delay 2 days 9 hours to Kaohsiung due to bad weather and port closure in previous ports. The ETA Kaohsiung port will be revised to Dec 20th, 2011.
The vessel schedule is adjusted as follows:
ETA Kaohsiung: Dec 21th, 2011
ETA Taichung: Dec 21th, 2011
ETA Keelung: Dec 22th, 2011
ETA Ningbo: Dec 23th, 2011
ETA Qingdao: Dec 24th, 2011
ETA Xingang: Dec 26th, 2011
ETA Dalian: Dec 27th, 2011
ETA Lianyungang: Dec 28th, 2011
December 15, 2011
This is to advise that with effect from 1st January, 2012, the Rate Restoration (RR) for DRY and REEFER shipments will be applied as follows:
December 09, 2011
Please be advised that M.V. Chao Shan He 528S/N will change port rotation at Taiwan from Kaohsiung-Taichung-Keelung to Keelung-Kaohsiung-Taichung. The vessel schedule is adjusted as follows:
December 08, 2011
This is to advise that the schedule of M.V. KOBE EXPRESS 50W42/50E49 will be changed due to bad weather and port congestion in previous ports.
December 05, 2011
Please be advised that M.V. OOCL HOUSTON 043N will delay 134 hours to Kaohsiung due to port closure and congestion at Shanghai. The ETA Kaohsiung port will be revised to Dec 10th, 2011.
The vessel schedule is adjusted as follows:
ETD Kaohsiung: Dec 10th, 2011
ETA Hong Kong: Dec 11th, 2011
December 02, 2011
This is to advise that with effect from 1st January, 2012, the Alameda Corridor Charge (ACC) for all DRY and REEFER shipments will be applied as follows:
US$ 22 Per 20'
US$ 43 Per 40'
US$ 43 Per 40'HQ
US$ 49 Per 45'HQ
Noted : Based on Cargo Receiving Date
December 01, 2011
Major Trans-Pacific shipping lines of the Canada Transpacific Stabilization Agreement (CTSA), wish to advise their customers that effective January 1, 2012, the Fuel Recovery Charge will be at the following levels:
Via East Coast
US$ 847 per 20'
US$ 1059 per 40'
US$ 1191 per 40'HQ
US$ 1341 per 45'HQ
Via West Coast:
US$ 430 per 20'
US$ 538 per 40'
US$ 605 per 40'HQ
US$ 681 per 45'HQ
December 01, 2011
Please kindly be advised that our outbound sailing schedule for Australia will omit two sailing in week 50 and week52. The sailing schedule is revised as follows:
November 29, 2011
Please be advised that M.V. Chao Shan He 527S/N will change port rotation at Taiwan from Kaohsiung-Taichung-Keelung to Keelung-Kaohsiung-Taichung. The vessel schedule is adjusted as follows:
ETA Keelung: Nov 27th, 2011
ETA Kaohsiung: Nov 28th, 2011
ETA Taichung: Nov 29th, 2011
ETA Ningbo: Nov 30th, 2011
ETA Qingdao: Dec 2nd, 2011
ETA Xingang: Dec 4th, 2011
ETA Dalian: Dec 6th, 2011
ETA Lianyungang: Dec 7th, 2011
November 25, 2011
This is to advise that original M.V. ANL CHONGQING V-001W, Cut-off date is 13th Dec., will be adjuested as M.V. MOL CREATION V-026W, and the detail schedule is as follows:
November 25, 2011
This is to advise that with effect from 24th December, 2011, the Bunker Adjustment Factor (BAF) for all DRY and REEFER shipments will be applied as follows:
USD 625 per 20’
USD 1250 per 40’
USD 1250 per 40’HQ
Note: Based on shipment on-board date
November 25, 2011
This is to advise that with effect from 1st January, 2012, the Currency Adjustment Factor (CAF) at 7% will be applied for all DRY and REEFER shipments.
Note: Based on cargo receiving date
November 24, 2011
OOCL would like to advise the following Revenue Recovery Increase will apply on our Asia to USA and Canada no later than January 1st, 2012 :
USD 320 per 20'
USD 400 per 40'
USD 450 per 40HQ
USD 505 per 45'
Note: Based on Cargo Receipt date
November 23, 2011
We would like to raise your attention to cargo acceptance of heavy and high density commodities.
Heavy and high density commodities, and / or their particular shape normally is not suitable to be packaged in cartons or on pallets in a container. It has high potential of damage to container, or may cause injury during the transport if not properly secured and weight distributed properly in the container.
November 18, 2011
Please be advised that M.V. RIO DE JANEIRO EXPRESS 01E46 will be phased in PNX service which will depart from Shekou port on 18th Nov, 2011, details as below:
ETD Kaohsiung: Nov 20th, 2011
ETA Kobe: Nov 22th, 2011
ETA Nagoya: NOV 23th, 2011
ETA Tokyo: NOV 24th, 2011
Should you have any queries, please feel free to email or contact our customer service department. For more information, please visit our website www.oocl.com
November 16, 2011
Please be advised that M.V. NYK ATLAS 61W43 will arrive Kaohsiung 3 days behind schedule due to terminal related delay at Oakland port. The ETA Kaohsiung port will be revised to 17th Nov, 2011.
And the vessel will phase out to dry dock at Shekou port.
November 11, 2011
Please be advised that M.V. OOCL NINGBO 72E44 will arrive Kaohsiung 45 hours behind schedule due to port congestion and rotation change at previous ports.
The vessel schedule is adjusted as follows:
ETD Kaohsiung: Nov. 10th, 2011
ETA Long Beach: Nov. 22th, 2011
November 09, 2011
This is to advise that the berthing terminal at Kaohsiung of OOCL TIANJIN 064W will change to Pier 70 instead of Pier 65. Her arrival will be revised on Nov 7th, 2011 at 07:00 hours.
November 07, 2011
This is to advise that with effect from December 1, 2011, the Winter Surcharge for all DRY and REEFER shipments to Russia with gateway via St. Petersburg will be applied as follows:
USD 100/ Per 20', USD 200/ Per 40',
USD 200/ Per 40' HQ
November 07, 2011
Please be advised that M.V. Chao Shan He 525N will change port rotation at Taiwan from Kaohsiung-Taichung-Keelung to Taichung-Kaohsiung-Keelung. The vessel schedule is adjusted as follows:
November 02, 2011
Dear Valued Customers,
Please be advised that M.V. OOCL SHENZHEN 53E39 will arrive Kaohsiung 76 hours behind schedule due to delayed departure from Singapore.
The vessel schedule is adjusted as follows:
ETA Kaohsiung: Oct 31, 2011
ETD Kaohsiung: Nov 01st, 2011
ETA Hong Kong: Nov 02st, 2011
Should you have any queries, please feel free to email or contact our customer service department. For more information, please visit our website www.oocl.com
October 31, 2011
Please be advised that M.V. DALIAN EXPRESS 67E43 will be phased in PNX service which will depart from shanghai port on 04th Nov, 2011, details as below:
ETD Kaohsiung: Nov 07th, 2011
ETA Vancouver: Nov 18th, 2011
October 31, 2011
泰國水患,曼谷港 (PAT- Bangkok Port) 因碼頭壅塞,自十月二十五日起停止進口櫃之作業。建議進出口客戶盡量從Laem Chabang進出貨。
October 27, 2011
Please be advised that M.V. OOCL HOUSTON 042N will delay 50 hours to Kaohsiung due to port congestion at Melbourne. The ETA Kaohsiung port will be revised to 01st Nov, 2011.
The vessel schedule is adjusted as follows:
ETD Kaohsiung: Nov 02th, 2011
ETA Hong Kong: Nov 03th, 2011
October 21, 2011
Please kindly be advised that our outbound sailing schedule for Cebu, Philippines will omit one sailing in week 42. The sailing schedule is revised as follows:
October 18, 2011
Please kindly be advised that in anticipation of the reduced demand during the winter slack season, South China East Coast Express (SCE) will be adjusted her route for the winter period. The effective sailing is ZIM ONTARIO V. 11E and the schedule is as follows:
October 17, 2011
Please be advised that M.V. ZIM LOS ANGELES 019E will delay 2 days to Kaohsiung due to Shekou port closure. The ETA Kaohsiung port will be revised to 15th Oct, 2011.
October 14, 2011
Please kindly be advised that Super Shuttle Express Service (SSX) will call OOCL Kaohsiung Container Terminal Pier 65, the effective sailing is OOCL Asia V.46E42 and the schedule is as follows:
October 12, 2011
Please be advised that M.V. THORSCAPE 007S will delay 4 days to arrive Keelung due to port congestion and bad weather at previous ports. The sailing schedule is revised as follows.
ETA Keelung: Oct 13, 2011
ETD Keelung : Oct 14th, 2011
ETA Hong Kong: Oct 15th, 2011
ETA Jakarta : Oct 21th, 2011
ETA Singapore: Oct 25th, 2011
October 12, 2011
Please be advised that M.V. CHAO SHAN HE 524 S/N will resume service at Dalian port after her drydocking at Xingang port. The vessel schedule is adjusted as follows:
ETA/ETD Kaohsiung:Oct 18th, 2011
ETA/ETD Taichung:Oct 19th, 2011
ETA/ETD Keelung:Oct 20th, 2011
ETA Ningbo:Oct 21th, 2011
ETA Qingdao:Oct 23th, 2011
ETA Xingang:Oct 25th, 2011
ETA Dalian:Oct 27th, 2011
ETA Lianyungang:Oct 28th, 2011
October 11, 2011
Please be advised that M.V. OOCL YOKOHAMA 045N will delay 4 days to Kaohsiung due to port congestion at Melbourne. The ETA Kaohsiung port will be revised to 12th Oct, 2011.
The vessel schedule is adjusted as follows:
ETD Kaohsiung: Oct 13th, 2011
ETA Hong Kong: Oct 14th, 2011
October 06, 2011
Please be advised that M.V. FAR EAST CHEER 208N/209S will delay 4 days to Kaohsiung due to tough sea condition and heavy weather at Shantou port.
The vessel schedule is adjusted as follows:
ETA Kaohsiung: Oct 07th, 2011
ETA Taichung: Oct 08th, 2011
October 05, 2011
自即日起,出口至 緬甸、巴基斯坦、印度 等國家不接受運費到付“Freight Collect”條件。
October 05, 2011
100年10月08日(週六)至 10月10日(週一)適逢雙十國慶節連續假期,謹提供放假期間高雄、基隆及台中港之作業時段供您參考。
October 04, 2011
Please be advised that M.V. TENG YUN HE 057 S/N will idle a week in Lianyungang port due to China National Holiday. The vessel schedule is adjusted as follows:
ETA Kaohsiung: Oct 9th, 2011
ETA Taichung: Oct 10th, 2011
ETA Keelung: Oct 10th, 2011
September 30, 2011
全新高雄 / 廈門直航快船,自9/30起固定每週五結關,週二開船,航程1天抵廈門海天碼頭。艙位充足,歡迎洽詢業務代表或客服人員。Tel: 2-23978168
September 28, 2011
KTX1船名 OOCL AUSTRALIA 081S ,原定九月二十七日抵達高雄,因受日本颱風影響,船期延至九月二十八日抵達高雄。
September 26, 2011
2011年中國國慶日放假時間為:10月1日至7日放假調休,共7天。10月8日(星期六)、10月9日(星期日)上班。
September 21, 2011
This is to advise that with effect from 15th October, 2011, the Rate Restoration (RR) for DRY and REEFER shipments will be applied as follows:
USD 250 per 20'
USD 500 per 40'
USD 500 per 40HQ
September 19, 2011
100年9月10日(週六) 至 9月12日(週一) 適逢中秋節連續假期,謹提供放假期間高雄、基隆及台中港之作業時段供您參考。
September 07, 2011
This is to advise that with effect from 9th September, 2011, the Rate Restoration (RR) for DRY and REEFER shipments will be applied as follows:
USD 75 per 20', USD 150 per 40', USD 150 per 40HQ
September 06, 2011
Please be advised that M.V. OOCL AUSTRALIA 080S will delay 3 days to Kaohsiung due to Nagoya port closure by typhoon Talas. The ETA Kaohsiung port will be revised to 9th Sep, 2011.
The vessel schedule is adjusted as follows:
September 05, 2011
Please kindly note our offices in Taiwan will be closed from September 10 (Saturday) through September 12 (Monday) for Mid-Autumn Festival. For any matters that require urgent attention during Mid-Autumn Festival, please kindly contact the following key persons by e-mail or mobile phone.
August 31, 2011
Please be advised that OTWL and OLTWL offices in Kaohsiung are closed on Monday, Aug 29 per local city governments announcement that all offices and schools would be closed due to typhoon Nanmadol is hitting Southern Taiwan. Port of Kaohsiung is closed since Aug 29 0500 hours until further notice.
August 29, 2011
親愛的客戶:因颱風風力達管制標準,高雄港仍持續停止海上作業。本公司高雄貨櫃中心自8月29日下午18:30起恢復收受出口重櫃。
August 29, 2011
This is to advise that with effect from 1st October to 31th October, 2011, the Currency Adjustment Factor (CAF) at 9% will be applied for all DRY and REEFER shipments.
August 25, 2011
Please be advised M.V. ANL Warrain 032S delayed one day arrival to Kaohsiung due to port congestion at Shanghai. The vessel schedule is adjusted as follows:
August 23, 2011
Please be advised that due to delay departure from Lianyungang port, M.V. Chao Shan He 520S will delay 3 days to Taiwan. The vessel schedule is adjusted as follows:
August 15, 2011
This is to advise that with effect from 15th September, 2011, the Rate Restoration (RR) for DRY and REEFER shipments will be applied as follows: USD 250/per 20'; USD 500/per 40';USD 500/per 40HQ
August 11, 2011
Effected by port closure in Ningbo Port, the AEA2 vessel “ANL WYONG V.032S” delays her arrival to Kaohsiung. The ETA Kaohsiung port will be revised to 12:00PM, Aug 11th, 2011; ETB 13:00 PM, Aug 11th, 2011.
August 10, 2011
第26屆世界大學生夏季運動會(以下簡稱大運會)將于2011年8月12日至23日在中國廣東省深圳市舉行,在此期間,深圳市將實施多項交通管制措施。具體交通管制內容如下,敬請留意。
August 02, 2011
We wish to bring to your attention that BNSF has recently embargo a specific customer due to inadequate/improper blocking and bracing of cargo. We would like to remind you the importance of proper cargo blocking and bracing in order to prevent injury to personnel, damage to goods and equipments.
August 01, 2011
親愛的客戶:本公司Vessel Information Board網頁新增高雄碼頭最新船舶動態,供您及時掌握船期資訊。歡迎多加利用。 http://www.oocl.com/taiwan/eng/localinformation/vib/
July 29, 2011
Further to our announcement dated July 12, 2011, the effective date will be adjusted to Aug 15, 2011
July 21, 2011
Further to our announcement dated July 08, 2011, the effective date will be adjusted to Aug 15, 2011
July 21, 2011
This is to advise that with effect from 15th August, 2011, the Peak Season Surcharge (PSS) for DRY and REEFER shipments will be applied as follows: USD 300 per 20’/USD 600 per 40’/USD 600 per 40’HQ
July 15, 2011
This is to advise that with effect from 15th August, 2011, the Peak Season Surcharge (PSS) for DRY and REEFER shipments will be applied as follows: USD 250 per 20’; USD 500 per 40’ USD 500 per 40’HQ
July 15, 2011
Further to our announcement dated May 31, 2011, the effective date will be adjusted to Aug 1, 2011, details as follows:
USD 320 per 20’; USD 400 per 40’
USD 450 per 40’HQ; USD 505 per 45’HQ
July 12, 2011
This is to advise that with effect from 15th July, 2011, the Rate Restoration (RR) for DRY and REEFER shipments will be applied as follows:
USD 250 per 20'; USD 500 per 40'
USD 500 per 40HQ
July 11, 2011
Further to our announcement dated May 31, 2011, the effective date will be adjusted to Aug 1, 2011
July 08, 2011
This is to advise that with effect from August 1, 2011, the Currency Adjustment Factor (CAF) at 9% will be applied for all DRY and REEFER shipments.
June 29, 2011
Further to our announcement dated June 2, 2011, this is to advise that with effect from July 1, 2011, the Bunker Charge (BUC) for all DRY and REEFER shipments will be revised as follows:
West Coast:
USD 430 per 20’; USD 538 per 40’
USD 605 per 40’HQ; USD 681 per 45’HQ
Other Than West Coast:
USD 847 per 20’; USD 1059 per 40’
USD 1191 per 40’HQ; USD 1341 per 45’HQ
June 29, 2011
The European Union (EU) Commission and Member States agreed that the grace period for compliance to EU Regulation 1875/2006 will be effective until June 30, 2011.
June 07, 2011
This is to advise that with effect from 15th July, 2011, the Peak Season Surcharge (PSS) for all DRY and REEFER shipments will be applied as follows: USD 320 per 20’; USD 400 per 40’; USD 450 per 40’HQ; USD 505 per 45’HQ
May 31, 2011
May 31, 2011
This is to advise that with effect from 1st August, 2011, the Peak Season Surcharge (PSS) for all DRY and REEFER shipments will be applied as follows: USD 320 per 20’; USD 400 per 40’; USD 450 per 40’HQ; USD 505 per 45’HQ
May 31, 2011
This is to advise that with effect from 1st July, 2011, the Currency Adjustment Factor (CAF) at 10% will be applied for all DRY and REEFER shipments.
Note: Based on cargo receiving date
May 30, 2011
This is to advise that with effect from 11 JUNE, 2011, the Bunker Adjustment Factor (BAF) for all DRY and REEFER shipments will be applied as follows: USD 600/20GP USD 1200/40GP USD 1200/40HQ
May 12, 2011
自今年 (2011) 五月十五日起,本公司中東出口航線所承運貨物,其運費將調漲USD 200/20呎 USD 400/40呎,生效日期以裝船日為準
May 10, 2011
This is to advise that with effect from 21 May, 2011, the Bunker Adjustment Factor (BAF) for all DRY and REEFER shipments will be applied as follows:
USD 600/20’
USD 1200/40’
USD 1200/40’HQ
April 20, 2011
自今年 (2011) 四月十一日起,本公司中東出口航線所承運貨物,其運費將調漲USD 150/20呎 USD 300/40呎,生效日期以裝船日為準。
另裝船日自四月十五日起之印巴出口航線貨物,其運費也將調漲USD 100/20呎 USD 200/40呎,生效日期以裝船日為準。
April 13, 2011
This is to advise that with effect from 15th April, 2011, the Rate Restoration (RR) for DRY and REEFER shipments will be applied as follows: USD 250/per 20';USD 500/per 40'
USD 500/per 40HQ
April 06, 2011
Further to our previous customer advisory about the earthquakes and Tsunami along the northeast coast of Japan on March 11, please find below the latest update of the Japanese Port Operation and our shipments.
March 18, 2011
This is to advise that with effect from 16 April, 2011, the Bunker Adjustment Factor (BAF) for all DRY and REEFER shipments will be applied as follows: USD 575/per 20’; USD 1150/per 40’; USD 1150/per 40’HQ
March 16, 2011
Subsequent to the earthquakes and Tsunami along the northeast coast of Japan on March 11, please find below the latest update of the port operations and our shipments. We will keep you posted of further updates once new information is available
March 15, 2011
This is to advise that with effect from 1st April, 2011, the Bunker Charge (BUC) for all DRY and REEFER shipments will be applied as follows:
West Coast
USD374/20'
USD468/40'
USD527/40'HQ
USD592/45'HQ
East Coast
USD703/20'
USD879/40'
USD989/40'HQ
USD1112/45'HQ
March 03, 2011
This is to advise that with effect from 1st March, 2011, the Emergency Risk Surcharge (ERS) for all DRY shipments will be applied as follows: USD 41/per 20'; USD 82/per 40'
USD 82/per 40HQ
March 02, 2011
This is to advise that with effect from 26th March, 2011, the Bunker Adjustment Factor (BAF) for all DRY and REEFER shipments will be applied as follows:
USD 525/per 20'; USD 1050/per 40'; USD 1050/per 40HQ
February 23, 2011
Dear Valued Customers,
This is to advise that with effect from 1st April, 2011, the Bunker Adjustment Factor (BAF) for all DRY and REEFER shipments will be applied as follows:
USD 625/per 20'; USD 1250/per 40'; USD 1250/per 40HQ
February 23, 2011
Dear Customer,
As you may be aware that negotiation for new contract between BC Maritime Employees Association (BCMEA) and International Longshore and Warehouse Union (ILWU) in Vancouver, BC is still in progress. At this time, the outcome is uncertain, but we are monitoring the situation closely and will keep our valued customers informed should there be any development which may impact your cargo.
February 02, 2011
Dear Customer,
Despite the recent upheaval in the political situation in Egypt, OOCL has so far received no notification on the change of the convoys in the Suez Canal and operation remains normal.
However, due to port closure in Damietta and Sokhna, there will be possible disruption to cargo operation. OOCL will keep affected customers informed.
OOCL will closely monitor the situation and will keep our customers informed of all latest situation.
February 01, 2011
Please kindly note our offices in Taiwan will be closed from February 2 (Wednesday) through February 7 (Monday) for Chinese New Year Holidays. For any matters that require urgent attention during CNY holidays, please kindly contact the following key persons by e-mail or mobile phone.
January 28, 2011
This is to advise that with effect from 26th Feburary, 2011, the Bunker Adjustment Factor (BAF) for all DRY and REEFER shipments will be applied as follows:
USD 475/per 20';USD 950/per 40';USD 950/per 40HQ
January 28, 2011
依歐盟國家海關規定,自2011年1月1日起,輸往、過境或經歐盟國家港口轉運之貨物,運送人應於裝船24小時前預先申報入境摘要 ( Entry Summary Declaration, ENS),以便通關入境。
茲為反映作業成本,本公司決定自2011年2月1日起,調整歐洲、地中海航線出口文件製作費( Documentation Fee)如下
January 11, 2011
春節長假期間,以下地區港口對於危險品進口有以下限制。
#貴州、廣西、雲南、海南及 *珠江三角洲港,自2011年1月26日起至2011年2月8日止,禁止危險品進口。 *黃埔/佛山/三水/廣州/湛江/中山/珠海/江門/汕頭/惠州/東莞港口地區
#蛇口/鹽田/大鏟灣等深圳地區港口危險品操作不受春節假期影響。
任何因以上進口限制而引起的中轉港滯箱費應由客戶自行承擔,敬請合理安排您的危險品貨物運輸。
January 05, 2011
This is to advise that with effect from 30th January, 2011, the Bunker Adjustment Factor (BAF) for all DRY and REEFER shipments will be applied as follows: USD 450 per 20’, USD 900 per 40’, USD 900 per 40’HQ
January 05, 2011